High-Voltage Substation & Transmission Infrastructure

High-voltage electrical infrastructure project combining a 220/132 kV air-insulated substation with associated transmission-line works. The project scope involves coordinated engineering, equipment procurement, civil and electrical construction, protection systems and commissioning activities.

High-Voltage Substation & Transmission Infrastructure

Engineering Scope & Technical Execution

Substation Engineering

Engineering and coordination for a 220/132 kV air-insulated substation including switchyard layout, power transformers, bus systems, protection and control infrastructure.

Transmission Infrastructure

Execution coordination for a 132 kV overhead transmission corridor including tower foundations, structures, conductors, insulators and associated line hardware.

Protection & Control

Integration and testing of protection, metering, control, communication and auxiliary systems required for reliable substation operation and grid connectivity.

Testing & Commissioning

Equipment inspection, pre-commissioning tests, relay coordination checks, functional testing, energisation planning and coordinated commissioning of the electrical infrastructure.

Key Technical Deliverables & Parameters

  • 220/132 kV AIS substation
  • 68 km 132 kV transmission corridor
  • Power transformer and switchyard infrastructure
  • Protection and control systems
  • Grid metering and communication systems
  • Transmission tower and conductor installation
  • Integrated testing and commissioning
Confidentiality & Engineering Data Notice

Single Line Diagrams (SLDs), protection coordination charts, and specific client commercial metrics for this project are kept confidential under developer covenants. Detailed engineering dossiers can be presented during formal pre-qualification processes.

Facility Specifications

Target Capacity: 220/132 kV Substation + 68 km Transmission Line
Technology Architecture: 220/132 kV AIS substation, power transformers, protection & control systems, 132 kV transmission corridor
Project Geography: Central India
Client Entity: Confidential Power Infrastructure Developer
Current Lifecycle Status: Under Execution
Year of Execution: 2026
Project Consultation & RFP

Consult on Engineering Specifications for Your Facility

Contact our technical leadership to evaluate BESS sizing, interconnection requirements, or utility-scale turnkey balance of plant.

HQ: IMT Manesar, Gurgaon 0124-4273124 sales@ultrathonelectric.com