EPC Engineering Support & Technical Services

Specialized high-voltage electrical, civil, and substation engineering support for prime contractors, project developers, and industrial infrastructure builders. Delivering rigorous ETAP simulations, physical layouts, protection coordination, and CEIG statutory compliance without requiring turnkey execution.

The Specialized HV Engineering Gap

Bridging Complex High-Voltage Design & Regulatory Bottlenecks for Prime EPCs

General infrastructure contractors and balance-of-plant builders regularly win large multi-megawatt renewable, industrial, or transmission tenders. However, handling specialized 33kV to 400kV grid interconnections, complex numerical relay protection schemes, and Chief Electrical Inspector to Government (CEIG) regulatory vetting requires deep domain expertise that is difficult to maintain in-house.

Ultrathon Electric acts as an agile engineering back-office and technical partner. We take complete responsibility for your power systems simulations, detailed construction drawings, Bill of Quantities (BOQ), and vendor technical evaluations, allowing your project teams to focus on on-site procurement, civil execution, and client management.

11kV–400kV Voltage class engineering coverage for both AIS and GIS substation infrastructure
100% First-time statutory compliance track record for CEIG and STU grid connection dossiers

Multi-Disciplinary Engineering Deliverables

Modular engineering deliverables tailored to your exact contractual scope:

✓

Power System Studies (ETAP / PSCAD)

Short circuit (IEC 60909), load flow, arc flash calculations, motor acceleration, and transient stability.

✓

Protection Relay Coordination & Settings

Time-Current Curves (TCC), differential 87T, distance 21, overcurrent 50/51, and tripping logic matrices.

✓

Substation Physical Layouts (AIS & GIS)

General arrangement, statutory clearance profiles, busbar mechanical sizing, and control room architecture.

✓

Civil & Structural Foundations (STAAD.Pro)

Transformer blast walls, plinths, gantry tower foundations, equipment support structures, and cable trenches.

Specialized Packages

Comprehensive Engineering Work Packages

Flexible, high-precision engineering services ready to integrate into your existing project organization.

01

ETAP Power System Studies

Accurate simulation of high-voltage networks under normal and contingency operations. Mitigating equipment overloading, identifying short-circuit stresses, and modeling harmonic distortion levels as per IEEE 519.

  • • Short circuit to IEC 60909 / ANSI C37
  • • Harmonic filter & APFC bank design
  • • Arc flash hazard analysis (NFPA 70E)
02

Protection Coordination & Settings

Preventing nuisance tripping and ensuring fast fault clearance. We calculate setting files for ABB, Siemens, Schneider, and SEL numerical relays, generating complete relay coordination reports for utility sign-off.

  • • Transformer Differential (87T) & REF (64R)
  • • Feeder Overcurrent/Earth Fault (50/51, 50N/51N)
  • • Line Distance (21) & Breaker Failure (50BF)
03

AIS & GIS Substation Layouts

Complete physical design from 33kV to 400kV. Detailed General Arrangement (GA) drawings, section elevations, phase-to-phase and phase-to-earth electrical clearances, and safety maintenance access corridors.

  • • Flexible ACSR/AAAC busbar & rigid tube sizing
  • • Gas-Insulated Switchgear (GIS) indoor hall layout
  • • Cable trench, duct bank & tray schedules
04

Earthing Grid (IEEE 80) & Shielding

Design of maintenance-free substation grounding grids to ensure touch and step voltages remain within safe physiological thresholds during high-voltage ground faults. Shield wire protection based on rolling sphere electrogeometric models.

  • • Soil resistivity modeling (Wenner 4-pin test)
  • • Mesh potential, touch & step voltage verification
  • • Rolling sphere shielding calculations (IEEE 998)
05

Substation Civil & Structural Design

Structural modeling in STAAD.Pro for gantry towers, equipment mounting structures, and transformer plinths subjected to wind, seismic, and short-circuit electrodynamic forces. Oil soak pits and fire blast containment walls.

  • • Transformer foundation with integrated oil containment
  • • Gantry tower & equipment support steel designs
  • • Control room architectural, HVAC & fire fighting
06

CEIG & Utility Statutory Dossiers

Complete engineering support for Chief Electrical Inspector to Government (CEIG) approvals and utility energisation clearances. We assemble single-line diagrams, clearance compliance certificates, and relay test reports.

  • • CEA Safety Regulation compliance certification
  • • SLDC/RLDC RTU telemetry & ABT metering packs
  • • Pre-commissioning test protocol review & sign-off
Workflow Collaboration

5-Stage Engineering Collaboration Process

A predictable, rigorous engineering delivery process designed to align seamlessly with prime contractor schedules.

STAGE 01

Design Basis Memorandum

Freezing grid connection codes, fault level limits, statutory clearances, customer specifications, and single-line architecture.

STAGE 02

Simulations & Concepts

ETAP power system simulations, short-circuit calculations, initial general arrangement drawings, and earth grid preliminary sizing.

STAGE 03

Detailed Engineering

Construction-ready layouts, sections, civil foundation designs, cable schedules, schematic wiring diagrams, and procurement BOQs.

STAGE 04

Vendor Drawing Reviews

Thorough review of Guaranteed Technical Particulars (GTP) and vendor drawings for transformers, breakers, CT/PTs, and relays.

STAGE 05

Statutory Dossier & As-Built

Assembly of CEIG approval dossiers, testing support during pre-commissioning, and final as-built drawing handover.

Engineering FAQ

Frequently Asked Questions: EPC Engineering Support

Common questions regarding collaboration models, software platforms, and deliverable handoffs.

No. Ultrathon acts as a flexible, dedicated engineering and technical partner. Prime EPC contractors, civil construction firms, and equipment manufacturers regularly retain our engineering desk strictly for specialized design packages, such as ETAP power systems studies, high-voltage substation layouts, protection relay settings, or CEIG statutory approvals, while retaining full ownership of on-site procurement and civil construction.
We perform comprehensive power system analyses including steady-state load flow, short-circuit current calculations (as per IEC 60909 and ANSI/IEEE), motor starting transients, numerical relay coordination (time-current characteristic curve matching), harmonic resonance analysis (IEEE 519 compliance), dynamic transient stability for grid-code compliance, and arc flash hazard assessments.
Yes. We prepare complete statutory approval dossiers for state Chief Electrical Inspector to Government (CEIG) approvals, State Transmission Utility (STU), and Central Transmission Utility (CTU) grid connectivity. This includes single-line diagram endorsements, clearance verification, earth mat resistance calculations, transformer protection settings, and test report dossiers required for energization.
Our engineering team covers 11kV, 33kV, 66kV, 132kV, 220kV, and 400kV substations across both Air-Insulated Switchgear (AIS) and Gas-Insulated Switchgear (GIS) architectures, including single bus, transfer bus, double bus, and breaker-and-a-half configurations.
Project Consultation & RFP

Partner with Our Power Engineering Desk

Discuss your upcoming project tender, substation design package, or power systems simulation requirements with our engineering directors.

HQ: IMT Manesar, Gurgaon • 0124-4273124 • sales@ultrathonelectric.com