Engineering Scope & Technical Execution

BESS System Integration

Integration of a containerised 1 MW / 1 MWh Battery Energy Storage System using a modular battery architecture designed for grid-connected operation and field performance evaluation.

Power Conversion & Electrical Systems

Integration of two 500 kW power conversion units together with associated transformation, protection, auxiliary power and electrical balance-of-system infrastructure.

Grid Interconnection

Coordination of the medium-voltage electrical interface, including the dedicated switching and protection infrastructure required to connect the BESS installation with the existing utility network.

Testing & Performance Evaluation

System inspection, electrical testing, functional checks, controlled energisation and performance evaluation under defined operating conditions, followed by operational monitoring and project close-out activities.

Key Technical Deliverables & Parameters

  • 1 MW / 1 MWh grid-connected BESS
  • Visakhapatnam District, Andhra Pradesh
  • Containerised modular battery architecture
  • 2 × 500 kW power conversion units
  • Medium-voltage grid interconnection
  • Dedicated switching and protection infrastructure
  • System testing and controlled energisation
  • Field performance evaluation and operational support
Confidentiality & Engineering Data Notice

Single Line Diagrams (SLDs), protection coordination charts, and specific client commercial metrics for this project are kept confidential under developer covenants. Detailed engineering dossiers can be presented during formal pre-qualification processes.

Facility Specifications

Target Capacity: 1 MW / 1 MWh
Technology Architecture: Containerised BESS with 2 × 500 kW Energy Servers / PCS, 90 × 15 kWh battery modules, 2 × 500 kVA 440/11 kV transformers and 11 kV / 33 kV grid interconnection
Project Geography: Southern Coastal India
Client Entity: Confidential Utility Client
Current Lifecycle Status: Pilot / Performance Evaluation
Year of Execution: 2026
Project Consultation & RFP

Consult on Engineering Specifications for Your Facility

Contact our technical leadership to evaluate BESS sizing, interconnection requirements, or utility-scale turnkey balance of plant.

HQ: IMT Manesar, Gurgaon 0124-4273124 sales@ultrathonelectric.com